Tender Notice for Drilling of Two Boreholes, Construction of Concrete Slabs, and Supply & Installation of Hand Pump Systems
--Powermax General Electrical Merchants Ltd--
Job Description
Dufatanye Organization is a community-focused non-governmental organization committed to improving access to clean water, sanitation, and sustainable livelihoods in rural communities across Rwanda. Through its interventions, under the Village of Hope project, Dufatanye aims to reduce waterborne diseases, improve hygiene standards, and enhance the quality of life for vulnerable populations.
This project, titled “Village of Hope”, is implemented in partnership with the Suyana Foundation, an organization dedicated to supporting sustainable water access and community resilience initiatives globally.
Under this partnership, Dufatanye seeks to improve access to safe and reliable water sources in Nyanza and Nyaruguru Districts through the construction of boreholes equipped with hand pump systems.
Job Industry
Job Salary Currency
RWFJob Salary Fixed
NoKey Deliverables
A. Borehole Drilling
1. Borehole Drilling (Nyanza District)
Site Location
- Province: Southern Province
- District: Nyanza
- Sector: Rwabicuma
- Location: Mubuga-Nyamiseke
Specifications
- Number of boreholes: 1
- Expected depth: 0m–100 meters (as determined by hydrogeological survey)
- Diameter of drilling: 6”
Required Activities
- Drilling (RIG MACHINE PRD SPD STALL)
- Casing installation (125mm PVC)
- Gravel packing (size 4.3mm of Gravel)
- Well development (airlifting)
- Test pumping (yield test maximum expected 1.5m³/h)
2. Borehole Drilling (Nyaruguru District)
Site Location
- Province: Southern Province
- District: Nyaruguru
- Sector: Rusenge
- Village: Mariba-Rusaniro
Specifications
- Number of boreholes: 1
- Expected depth: 0m–120 meters (as determined by hydrogeological survey)
- Diameter of drilling: 6”
Required Activities
- Hydrogeological survey (already completed)
- Drilling (RIG MACHINE PRD SPD STAR)
- Casing installation (125mm PVC)
- Gravel packing (size 4.3mm of Gravel)
- Well development (airlifting)
- Test pumping (yield test maximum expected 1.5m³/h)
B. Construction of Concrete Slabs for 2 Boreholes
Purpose:
- Borehole protection and pump base
Type:
- Reinforced concrete slab
Typical Specifications:
- Thickness: 100 mm
- Diameter: 1.5–2 meters around borehole
Must Include:
- Drainage slope extending 6 meters away from borehole
- Soak pit or runoff channel
- Protective apron to prevent contamination
C. Pump Supply & Installation
Pump Type:
- Hand pump
Professional Qualifications
| Industry | Qualification |
|---|---|
| Construction / Building & Civil Engineering | Proven experience in similar borehole drilling projects List of equipment (drilling rig, compressors, support vehicles, etc.) Qualified personnel (hydrogeologist, drilling engineers, technicians, companies ) At least 3 past project references with contact details Company registration documents and tax clearance Work plan and methodology |